Pool Services
Outdoor living at its finest.
From the first sketch to the weekly skim — every service you need to build and keep a backyard you love.
Everything outdoors, under one roof.
Design
3D Pool Design
See it before we build it. Every curve and finish, rendered in 3D.
- Photoreal renders
- Material previews
- Iterate live
Build
New Custom Pools
One-of-a-kind builds engineered for Florida living.
- Freeform & geometric
- Sun shelves & beach entries
- Permits handled
Remodel
Pool Remodeling
Same footprint. Brand new pool.
- Resurface & retile
- Coping & deck refresh
- Modern equipment
Spa
Hot Tubs & Spas
Daily-use spas — integrated or standalone.
- Raised & spillover
- Efficient heating
- Custom seating
Features
Water Features
The sound of trickling water, tuned right.
- Sheer descents
- Bubblers & deck jets
- LED night scenes
Care
Pool Cleaning
Weekly service that actually shows up.
- Full-service visits
- Chemistry logged
- Equipment checks
From signature to first swim.
Eleven phases. Roughly 16–26 weeks total. Every step led by Superior crews — no subcontractors on the critical work.
- Phase 01
Design & Contract
1–2 weeksConsultation, site visit, 3D rendering, selections.
- Phase 02
Permitting
3–8 weeksCounty submittal & approval. We handle the paperwork.
- Phase 03
Site Prep
1–3 daysSod scrape, walkthrough, yard ready for layout.
- Phase 04
Excavation & Form
2–4 daysStakes, dig to depth, laser elevations, stabilization rock.
- Phase 05
Structure
1–2 weeks#3 rebar grid, pre-plumb, gunite shell shoot & cure.
- Phase 06
Plumbing & Electrical
3–5 daysMin. 2" Schedule 40 PVC, pressure tested, electrical rough-in.
- Phase 07
Tile, Coping & Decking
1–2 weeksTile set by hand, footers, termite treatment, deck pour.
- Phase 08
Equipment & Enclosure
3–5 daysPad poured, pump/filter/heater set, screen cage erected.
- Phase 09
Grade & Safety
1–2 daysFinal grade, safety devices, county inspection.
- Phase 10
Interior Finish
1–2 daysPlaster or pebble hand-troweled. Lifetime warranty.
- Phase 11
Fill, Startup & School
4–5 weeksFill, 30-day soft startup, salt added, pool school.
Pools here are different.
Nearly three decades and 10,000+ pools across Lee, Collier, Charlotte and Sarasota counties.
High Water Table
Sump system on every build to manage Florida groundwater.
Sandy Soils
Stabilization rock & compaction checked at multiple phases.
Coastal Materials
Every spec rated for salt air and saltwater exposure.
Hurricane-Ready
Equipment & decking meet or exceed FL Building Code.
Multi-County Permits
Lee, Collier, Charlotte & Sarasota — navigated daily.
30-Day Soft Startup
Our crew manages chemistry — we don't hand off and run.
Not sure where to start?
Tell us about your backyard — we'll come out, take a look, and put together a no-pressure plan.
Request a Free Estimate